Размер шрифта: A A A
Цвет сайта: С С С
Изображения: Вкл. Выкл.

Repair work on the heating main of SSAU

05.10.2021

In connection with the settled cold weather, the Governor of the Stavropol Territory, Vladimir Vladimirovich Vladimirov, gave an order to turn on heating at social facilities ahead of schedule. Unfortunately, due to an extraordinary accident, heating in the hostels of Stavropol SAU was not provided.

An accident occurred on the main pipeline feeding the heat supply facilities of Stavropol State Agrarian University. In connection with the emergency restoration work, the supply of the heat transfer fluid for the needs of heating and hot water supply was temporarily suspended.

Emergency recovery work has already been carried out, a section of the heating main has been replaced, and on the evening of October 5, a trial start of the system is planned. On October 6, heating and hot water supply will be supplied to all dormitories of Stavropol State Agrarian University. 


Возврат к списку